Structural waterproofing design is the work of deciding, for every below-ground space, what performance it needs, which combination of BS 8102:2022 protection types will reliably deliver it in the ground conditions, and how the critical junctions are resolved - then writing that down as a specification a contractor can be held to. CLW does that work from RIBA Stage 2 through construction, independent of any product or installer.

What clients say

“I've worked with CLW on several projects now. They have shown outstanding value in picking up on issues early, guiding the design team and ensuring work on site complies with best practice. Working with CLW has given me confidence in our development and the basement waterproofing. I will absolutely be working with them again on the next project.”
John Linklater · Project Director · Urbanest 2 Trafalgar Way
“I've worked closely with CLW on the Salisbury Square Development scheme, and they have shown outstanding value in picking up on issues early, guiding the design team and ensuring work on site complies with best practice. Working with CLW has given me confidence in our development and the basement waterproofing.”
Jianxi Cheng · Director · Avison Young Salisbury Square
“I worked with CLW on the 220 Blackfriars Road project and found their team to be very competent and professional. Their technical expertise on waterproofing design was valuable and allowed us to overcome some complex challenges.”
Miguel Bronze · Project Director · EPR Architects 220 Blackfriars Road

What the design consists of

Five deliverables, one owner, stage by stage.

This is what you receive when CLW is appointed to design the waterproofing. Each document answers a question the design team would otherwise leave to the contractor.

RIBA Stage 2

Waterproofing Strategy Report

A site-specific BS 8102:2022 risk assessment: the ground and groundwater regime, the consequence of failure for each space, and the strategy that follows from it. The grade of protection is agreed with the client here, space by space, and recorded. This is the document that stops waterproofing being an assumption inherited from the structural scheme.

RIBA Stage 3

Grades-of-performance plan and Design Philosophy Pack

Drawings that show which BS 8102 grade applies where, the Type A / B / C combination selected for each zone and why, typical details, and the critical junctions - capping beams, podium interfaces, piles, penetrations, movement joints - resolved in principle. Reviewed against the structural and architectural drawings for compatibility, and coordinated in the design team meetings.

RIBA Stage 4

Performance specification

A contractual document that states what the waterproofing must achieve rather than naming products: the grade per space, the hydrostatic case, joint and movement requirements, protection, penetration and interface rules, testing and design life. Competent specialist contractors tender against it with their own systems, which opens the competition and keeps installation liability with the installer.

RIBA Stage 4b

Tender support and contractor selection

Review of contractor proposals and product selections against the specification, attendance at technical interviews, responses to BS 8102 queries, and a plain recommendation. Bids are normalised so the client compares like with like.

RIBA Stages 5 to 6

Construction monitoring and handover review

Inspections at the critical stages of installation, review of the contractor’s QA submissions, written challenge of any departure from design intent, and a review of as-built and maintenance information at handover. It carries weight because CLW wrote the specification the work is being checked against.

The grades the design works in are set out in our BS 8102:2022 performance grades reference; how a grade is chosen for a given room is in what grade of waterproofing do I need. For a live London scheme, start with basement waterproofing consultants in London.

When to appoint

As early as RIBA Stage 2.

The earlier CLW is appointed, the more options remain on the table. By RIBA Stage 4, key Type A/B/C decisions and structural interfaces are often locked in. Sometimes against waterproofing best practice.

A CLW appointment at Stage 2 lets the design team shape the brief in ways that prevent risk rather than mitigate it. By Stage 3 we're producing the performance specification, and by Stage 4 we're in tender support and contractor selection.

Where the appointment comes later, Stage 4 or beyond. We do still help. The framing shifts from prevention to triage.