The Green Quarter, London
Waterproofing design for the lift pits to Phase 3, Parkside, at The Green Quarter, Southall, specifying Type A and Type B protection to achieve Grade 3 performance.
CLW were commissioned as the waterproofing design consultant for the lift pits to Phase 3, “Parkside”, at The Green Quarter, Southall. The work was undertaken for Berkeley Group West Thames.
Working closely with the wider design team, CLW developed a clear and efficient design for the Grade 3 waterproofing, specifying both Type A external membrane and Type B structurally integral protection to achieve this.
Project credit: Rolfe Judd. Structural engineer: Patrick Parsons.