Leeds College of Art - lower ground floor waterproofing design

Project case study

Leeds College of Art

Structural waterproofing design to the lower ground floor over a split level at Leeds College of Art.

CLW provided structural waterproofing design to the lower ground floor over a split level at Leeds College of Art. The work was undertaken for ISG PLC.

The waterproofing system was developed in co-ordination with the design team to suit the split-level arrangement of the lower ground floor.