Skip to content
CLW
Leeds Arts University - lower ground floor waterproofing design

Project case study

Leeds Arts University

Structural waterproofing design to the lower ground floor over a split level at Leeds Arts University.

CLW provided structural waterproofing design to the lower ground floor over a split level at Leeds Arts University. The work was undertaken for ISG PLC.

The waterproofing system was developed in co-ordination with the design team to suit the split-level arrangement of the lower ground floor.

Image credit: DLA Design.

Working on a comparable scheme?

Independent waterproofing design from RIBA Stage 2 through construction monitoring. Defensible, document-led, contractor-agnostic.