Project case study
Kidbrooke Village
Waterproofing design for a two-storey basement car park beneath Block G and associated podium areas at Kidbrooke Village, specifying Type A and Type B protection across Grade 2 and Grade 3 environments.
CLW were commissioned as the waterproofing design consultant for a two-storey basement car park at Kidbrooke Village, extending beneath the whole of Block G and the associated podium areas at ground level. Block F ground floor level is fully retained to one elevation and partially retained to two further sides.
Working closely with the wider design team, CLW developed a clear and efficient design for the waterproofing, specifying both Type A external membrane and Type B structurally integral protection. This addressed the required performance grades across the scheme, where both Grade 2 and Grade 3 environments were present.
Project credit: Reddy Architecture & Urbanism. Structural engineer: Patrick Parsons.
Working on a comparable scheme?
Independent waterproofing design from RIBA Stage 2 through construction monitoring. Defensible, document-led, contractor-agnostic.