220 Blackfriars Road, Southwark, EPR Architects scheme for JTRE London

Project case study

220 Blackfriars Road

Independent waterproofing design carried from RIBA Stage 2 through construction monitoring on JTRE London's Southwark scheme by EPR Architects, so the same designer owned the strategy from concept to the last pour.

The scheme

220 Blackfriars Road sits on a tight Southwark plot between the South Bank rail viaducts and the commercial corridor running north to the Thames, developed by JTRE London and designed by EPR Architects. CLW was appointed to provide independent waterproofing design from RIBA Stage 2 through construction monitoring: one brief carried across the full design and delivery sequence rather than handed off at tender.

What CLW did

Stage 2 onwards. The strategy was developed against the BS 8102:2022 Grade 3 requirement that the building’s commercial use demanded: a dry internal environment with no seepage or damp patches tolerated. Risk assessment, system selection, the performance specification and the inspection regime were all documented under a single design philosophy, so the warranty position and the construction sequence stayed legible to every party on the team.

Through construction. CLW stayed on as the monitoring designer, so there was no gap between what was specified and what was witnessed on site. On a constrained urban plot with rail infrastructure alongside, the detailing problems that matter are found at the interfaces, and the person who designed the interface is the right person to inspect it.

What the architect said

“I worked with CLW on the 220 Blackfriars Road project and found their team to be very competent and professional. Their technical expertise on waterproofing design was valuable and allowed us to overcome some complex challenges.”

Miguel Bronze, Project Director, EPR Architects

What this project illustrates

Project credit: EPR Architects · JTRE London.